ANALISIS KINERJA WAKTU DAN BIAYA PROYEK KONSTRUKSI DENGAN METODE EARNED VALUE ANALYSIS

Authors

  • Andi Marini Indriani Universitas Balikpapan
  • Gunaedy Utomo Universitas Balikpapan
  • Muhammad Rizqy Universitas Balikpapan

DOI:

https://doi.org/10.36277/geoekonomi.v13i2.219

Keywords:

time, cost, earned value analysis, schedule

Abstract

The International Airport Sultan Aji Muhammad Sulaiman (SAMS), Sepinggan Balikpapan is the gateway to East Kalimantan and is an airport with high aircraft movements every year. Periodic maintenance must be carried out to support airport performance. Runway surface overlay and paved shoulders is one of the works carried out for this purpose. In a construction project, good management is needed to control so that the project runs according to the planned time and cost. Earned Value Analysis (EVA) is one method that can be used to control projects. After analyzing using project data from week 1 to week 47, it is known that the costs incurred are greater than the budgeted value, this is indicated by the CPI value = 0.998. The implementation time is faster than the planned schedule, as seen in the SPI value of 1.142. The result of the final calculation of the project which indicates a loss and an estimated turnaround time of 65 weeks indicates a 4 week acceleration.

Downloads

Download data is not yet available.

Author Biographies

Andi Marini Indriani, Universitas Balikpapan

Prodi Teknik Sipil Universitas Balikpapan | andi.marini@uniba-bpn.ac.id 

Gunaedy Utomo, Universitas Balikpapan

Prodi Teknik Sipil Universitas Balikpapan

Muhammad Rizqy, Universitas Balikpapan

Prodi Teknik Sipil Universitas Balikpapan

References

Azizah, Siti Umi, Fakhrul Rozi Yamali, and Elvira Handayani. 2020. “Analisa Nilai Hasil Terhadap Waktu Pada Proyek Pembangunan Gedung Laboratorium FKIP Tahap IV (Lanjutan) Universitas Jambi.†Jurnal Talenta Sipil 3(2): 95.

Cipto, Rahajeng Cahyaning Putri. 2021. “Analisis Faktor-Faktor Yang Mempengaruhi Kinerja Pada Tenaga Kerja Bantuan (Honorer) Dinas Perhubungan Kota Balikpapan.†12(September 2021): 221–32.

Hasan, Famila. 2021. “Performance Analysis of Working Time And Cost of Rigid Arteries Using Earned Value Analysis ( EVA ) Method ( Case Study : Of the Construction Project of the Becakayu Toll Access Bridge on and off Ramp Jatiwaringin ).†3(5): 491–93.

Hendriyani, Irna, Andi Marini, and Nur Intan Putri. 2018. “Analisis SWOT Pemilihan Material Dinding Bata Merah Dan Bata Ringan Di Penajam Paser Utara.†Borneo Engineering : Jurnal Teknik Sipil 2(1): 22.

Juwari, Sudjinan, Ting Anita. 2021. “Pengelolaan Assets Perusahaan Dalam Optimalisasi Laba.†Geo Economi 12(1): 91–100.

Pratiwi, Reno et al. 2022. “Optimasi Waktu Dan Biaya Dengan Metode Time Cost Trade Off ( Tcto ) Pada Proyek Penambahan Bangunan Time And Cost Optimization Using The Time Cost Trade Off Method In The People ’ S Market Additional Building Project.†TRANSUKMA 4(2): 93–105.

Romadhona, Syahrur, Fredy Kurniawan, and Julistyana Tistogondo. 2021. “Project Scheduling Analysis Using the Precedence Diagram Method (PDM) Case Study: Surabaya’s City Outer East Ring Road Construction Project (Segment 1).†International Journal of Engineering, Science and Information Technology 1(2): 53–61.

Sari, Hikmah Maya, Irna Hendriyani, and Alifah Ersa Widyaningrum. 2021. “Earned Value Analysis Pada Proyek Pembangunan Gedung Arsip Kantor BPN: Earned Value Analysis of BPN Office Archives Building Projects.†Jurnal Ilmiah Teknik Sipil TRANSUKMA (Tanah Transportasi Struktur Manajemen Kontruksi) 3(2): 154–67. https://transukma.uniba-bpn.ac.id/index.php/transukma/article/view/84.

Sugianto, Agus, and Andi Marini Indriani. 2016. “Analisis Perbandingan Biaya Pekerjaan Rangka Atap Baja Ringan Dengan Rangka Atap Kayu.†2(1): 16–23.

Zega, A T. 2022. “Penerapan Dan Earned Value Analysis (EVA) Pada Proyek Pembangunan Gedung Di Tanah Merah Binjai.†Citra Sains Teknologi 1(2002): 120–27.

Downloads

Published

2022-09-22

How to Cite

Marini Indriani, A., Utomo, G., & Rizqy, M. (2022). ANALISIS KINERJA WAKTU DAN BIAYA PROYEK KONSTRUKSI DENGAN METODE EARNED VALUE ANALYSIS . Jurnal GeoEkonomi, 13(2), 128–137. https://doi.org/10.36277/geoekonomi.v13i2.219

Issue

Section

Articles